| Supplier Profile 1 | High-detail all-over artwork | Full-surface sublimation Photo-style graphics | Polyester, recycled polyester, polyester-elastane blends | 100–500 pairs per design | Approximately 15–30 working days after artwork approval | Sportswear brands, event organizers, online retailers | Check color consistency, artwork scale, wash testing, and sample approval procedures. |
| Supplier Profile 2 | Low-volume custom orders | Small-batch digital print Variable artwork | Combed cotton, polyester, nylon, elastane | 50–200 pairs per design | Approximately 10–25 working days after confirmation | Start-ups, creators, promotional campaigns | Confirm whether mixed sizes, mixed colors, and multiple designs are accepted within one order. |
| Supplier Profile 3 | Large-scale export production | Repeatable color output Bulk order workflow | Combed cotton, cotton-polyester blends, nylon, elastane | 500–2,000 pairs per design | Approximately 20–40 working days for bulk orders | Importers, wholesalers, chain retailers | Review monthly capacity, carton specifications, inspection standards, and export documentation. |
| Supplier Profile 4 | Eco-conscious product development | Recycled-fiber compatible Water-based artwork options | Recycled polyester, organic cotton, recycled nylon, elastane | 200–1,000 pairs per design | Approximately 20–35 working days, depending on material sourcing | Sustainable fashion labels and environmentally focused retailers | Request fiber-content evidence, recycled-material certificates, packaging details, and colorfastness results. |
| Supplier Profile 5 | Private-label packaging support | Custom labels Retail-ready packing | Cotton blends, polyester, nylon, elastane | 300–1,500 pairs per design | Approximately 20–40 working days after packaging approval | Private-label retailers, gift companies, subscription businesses | Confirm label dimensions, barcode handling, individual packaging, carton marks, and packing tolerances. |
| Supplier Profile 6 | Technical and performance socks | High-resolution graphics Functional construction | Polyester, nylon, elastane, moisture-management blends | 300–1,000 pairs per design | Approximately 25–45 working days, depending on construction | Outdoor brands, fitness companies, cycling and running teams | Test stretch recovery, moisture management, abrasion resistance, heel-to-toe fit, and size grading. |
| Supplier Profile 7 | Fast sampling and design iteration | Digital sample printing Rapid artwork revisions | Polyester, cotton-polyester blends, nylon, elastane | 50–300 pairs per design | Samples commonly take 5–12 working days; bulk timing varies | Design agencies, fashion collections, seasonal campaigns | Check sample-to-bulk color matching, revision limits, rush fees, and approval cut-off times. |